Pipeline Crossover to Process Skid

Before

Shown here is a picture of a pipeline crossing directly in front of a process skid on a natural gas site. This end user was in need of a solution to cross over the pipe and access the skid. What made this application difficult was the fact that the crossover needed to clear the pipe and land on the skid, which was lower than the height of the pipe.

After

This picture shows the crossover solution provided by ErectaStep and SunnySide Supply, Inc. As you can see, the versatility of ErectaStep’s modular design allowed for two different stair units to be combined for multi-level clearance/access. This solution was provided with typical stock products and was installed less than 5 days after ordering.